Flooring Day Two: Installation
These are pictures from the day I wrote the two “S.N.A.F.U.” posts about. Once Brandon got the kinks worked out with the flooring contractor they got to work.
(These pictures aren’t of the same quality as my usual pictures because Brandon took them with his phone’s camera, but I think it gives the whole thing a certain romantic antique look.)
The bathroom, sans toilet and sink pedestal:

Installing the subfloor in the kitchen:

Installing the subfloor in the bathroom:

Check back soon for pictures of the finished floors and some adventures with the bath tub!
[tags]ceramic tile, plumbing, contractors, kitchen, clawfoot tub, bathroom, photos, shower, flooring[/tags]
Tags: , bathroom, ceramic tile, clawfoot tub, contractors, flooring, kitchen, photos, plumbing, shower
This entry was posted on Saturday, August 16th, 2008 at 3:09 pm and is filed under bathroom, ceramic tile, clawfoot tub, contractors, flooring, kitchen, photos, plumbing, shower. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.





